2022
DOI: 10.1016/j.epsr.2022.107824
|View full text |Cite
|
Sign up to set email alerts
|

Mitigation of transient ground potential rise in gas insulated substations during very fast transient overvoltage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(7 citation statements)
references
References 25 publications
0
7
0
Order By: Relevance
“…The above three methods are used to suppress the overvoltage of substations, respectively, and a comparison of the simulation curves of specific voltage changes is shown in Figure 2. The method in this paper Reference [6] method Reference [7] method Each method has its own peak value Figure 2 shows that when the operating time of the substation is 2.2 seconds, a high fast transient overvoltage occurs internally, and all three methods reach the peak. Compared with the control group, the fast transient overvoltage in this method is better suppressed, which can ensure the amplitude reduction of the fast transient overvoltage level and effectively suppress the problem of high internal steady-state voltage, thereby improving the operational capacity of the substation project.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…The above three methods are used to suppress the overvoltage of substations, respectively, and a comparison of the simulation curves of specific voltage changes is shown in Figure 2. The method in this paper Reference [6] method Reference [7] method Each method has its own peak value Figure 2 shows that when the operating time of the substation is 2.2 seconds, a high fast transient overvoltage occurs internally, and all three methods reach the peak. Compared with the control group, the fast transient overvoltage in this method is better suppressed, which can ensure the amplitude reduction of the fast transient overvoltage level and effectively suppress the problem of high internal steady-state voltage, thereby improving the operational capacity of the substation project.…”
Section: Resultsmentioning
confidence: 99%
“…The comparison results are shown in Figure 3. The method in this paper Reference [6] method Reference [7] method Each method has its own peak value As shown in Figure 3, due to the increased rated power of the substation, the peak level of overvoltage increases, the dissipation time of overvoltage is prolonged, and the system needs a longer time to return to its normal working state.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Substations, critical part of a power system, shall operate with high reliability and experience a practically zero outage rate [4]. Thus, lightning-related studies regarding the direct-stroke shielding system design to substations and analysis of the arising surge overvoltages at substation have been a subject of extensive research [5], [6], [7], [8], [9], [10].…”
Section: Introductionmentioning
confidence: 99%