2022 International Power Electronics Conference (IPEC-Himeji 2022- ECCE Asia) 2022
DOI: 10.23919/ipec-himeji2022-ecce53331.2022.9807070
|View full text |Cite
|
Sign up to set email alerts
|

Mission Profile Emulator for Sub-Modules of Modular Multilevel Converter with Resonant Filter Impedance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 12 publications
0
0
0
Order By: Relevance
“…According to (14), the test current is a hybrid of AC and DC components. To accurately control the AC component of the test current, a quasi-resonant controller is used in the current controller.…”
Section: B Control Methods For the Test Module Group 1) Based On The ...mentioning
confidence: 99%
See 1 more Smart Citation
“…According to (14), the test current is a hybrid of AC and DC components. To accurately control the AC component of the test current, a quasi-resonant controller is used in the current controller.…”
Section: B Control Methods For the Test Module Group 1) Based On The ...mentioning
confidence: 99%
“…The Hbridge structure with upper and lower arms along with a DC bus produces better equivalent test stresses [10], however, more inductors are required in the test circuit. The test topology based on drag and H-bridge proposed by scholars can simultaneously test the stresses of the module under rectifier and inverter operating conditions, but this test topology is not capable of larger current operation tests [11]- [14]. Based on the idea of a synthetic operation test, General Electric proposed the full-bridge array equivalent test device, which has good stress equivalence and reduces the number of inductors but requires a large number of fullbridge modules [15].…”
Section: Introductionmentioning
confidence: 99%
“…However, the fault current rises sharply after a few milliseconds of fault occurs, which increases the difficulty of DCCBs' breaking capability. The larger the breaking current of DCCB, the more power electronic devices and the higher the construction cost are required [27][28][29][30], and the complexity of equipment design is increased.…”
Section: Introductionmentioning
confidence: 99%