2016
DOI: 10.12989/eas.2016.11.4.539
|View full text |Cite
|
Sign up to set email alerts
|

Minimum loading requirements for areas of low seismicity

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
17
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
7
3

Relationship

2
8

Authors

Journals

citations
Cited by 21 publications
(17 citation statements)
references
References 34 publications
0
17
0
Order By: Relevance
“…Therefore, an estimated seismic hazard for Malaysia was modelled by using probabilistic seismic hazard assessment (PHSA) based on the reference data of historical seismological ground motions obtained from respective distant earthquakes [30], [31]. Prior PHSA studies concluded that the peak of ground acceleration (PGA) values across Peninsular Malaysia probably fell between 0.02 and 0.10 g with an approximation of a 475/500-year return period [32,33]. On the contrary, the PGA values at East Malaysia was around 0.07 g (Sarawak) and 0.12 g (Sabah) with a 500-year return period [34], [35].…”
Section: Fig 1 -Sumatran Fault Lines and Subduction Zone Of The Indimentioning
confidence: 99%
“…Therefore, an estimated seismic hazard for Malaysia was modelled by using probabilistic seismic hazard assessment (PHSA) based on the reference data of historical seismological ground motions obtained from respective distant earthquakes [30], [31]. Prior PHSA studies concluded that the peak of ground acceleration (PGA) values across Peninsular Malaysia probably fell between 0.02 and 0.10 g with an approximation of a 475/500-year return period [32,33]. On the contrary, the PGA values at East Malaysia was around 0.07 g (Sarawak) and 0.12 g (Sabah) with a 500-year return period [34], [35].…”
Section: Fig 1 -Sumatran Fault Lines and Subduction Zone Of The Indimentioning
confidence: 99%
“…First, it restricts the selection to a limited number of available ground motion records. This can be more problematic in regions of low-to-moderate seismicity like Hong Kong where there is a paucity of strong motion data that can be sourced locally (Lam et al, 2016). More importantly, the seismological parameters are imperfect proxies for the ground motion properties of interest (such as response spectra and duration) and those properties are only indirect indicators of seismic actions imposed on a structure (Iervolino and Cornell, 2005).…”
Section: Cms For Rock Sitesmentioning
confidence: 99%
“…With a 2% building replacement rate, the majority of the building stocks have not been specifically designed for earthquake resistance. Moreover, a statutory amendment in 2018 has stipulated a minimum design hazard level of 0.08 g across the whole country based on the recommendation made by the author and his colleagues [38], which implies that the levels of design earthquake actions have been elevated in some locations, e.g., Brisbane.…”
Section: Seismic Retrofitting Of Existing Buildingsmentioning
confidence: 99%