2017
DOI: 10.1007/s10098-017-1376-3
|View full text |Cite
|
Sign up to set email alerts
|

Minimizing energy consumption via multiple installations aggregate production planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(8 citation statements)
references
References 30 publications
0
4
0
Order By: Relevance
“…), and this is shown in Table (3) and for the year 2021 Note that this data was obtained from the records of that company. 2) Analysis of the results of the sub-contracting strategy: Table (5) shows that the months in which the contract is (positive), we mean that the production is greater than the demand, there is no need to contract, but for the months (6-9-11-12) the production is less than the demand and it is a sign (Negative) This matter pushes the company to contract with other companies to fill the shortfall or not, as the amount of production shortfall amounted to (24549) thousand tons in 2021, and the cost of contracting per ton (100,000) thousand dinars, i.e. at a total cost estimated at (2.454.900,000) billion, and this leads us to accept the second hypothesis which states that the company needs a sub-contract to fill the production shortfall, knowing that the company does not contract with other companies and in this case the company will be faced with several things, the first: If the company contracts with other companies to fill the shortfall, it does not achieve profits, but rather loses the amount of (3000) thousand dinars on each ton as expenses.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…), and this is shown in Table (3) and for the year 2021 Note that this data was obtained from the records of that company. 2) Analysis of the results of the sub-contracting strategy: Table (5) shows that the months in which the contract is (positive), we mean that the production is greater than the demand, there is no need to contract, but for the months (6-9-11-12) the production is less than the demand and it is a sign (Negative) This matter pushes the company to contract with other companies to fill the shortfall or not, as the amount of production shortfall amounted to (24549) thousand tons in 2021, and the cost of contracting per ton (100,000) thousand dinars, i.e. at a total cost estimated at (2.454.900,000) billion, and this leads us to accept the second hypothesis which states that the company needs a sub-contract to fill the production shortfall, knowing that the company does not contract with other companies and in this case the company will be faced with several things, the first: If the company contracts with other companies to fill the shortfall, it does not achieve profits, but rather loses the amount of (3000) thousand dinars on each ton as expenses.…”
Section: Methodsmentioning
confidence: 99%
“…Many companies use the third strategy because it gives their users more flexibility in planning (Hahn & Brandenburg, 2018). If they are applied correctly, the company will be able to reduce its costs to the lowest possible limit and maximize its profits at the same time (Jamalnia et al, 2019) (Chaturvedi, 2017). Its outputs are inputs to the MRP system, which is the system that segments the products in detail and identifies the parts of each product.…”
Section: Aggregate Production Planning (App)mentioning
confidence: 99%
“…Demand forecasting has certain common characteristics that must be considered in evaluating a demand forecasting process and the forecasting methods used [23]. The characteristics of demand forecasting are as follows: -Causal factors that occurred in the past are assumed to remain relevant in the future.…”
Section: Forecastingmentioning
confidence: 99%
“…Deterministic Single Aghezzaf & Artiba, 1998;Silva & JoÄOoisboa, 2000;Pradenas & Pe˜nailillo, 2004;Fahimnia et al, 2005;Pipery & Vachony, 2001;Singhvi & Shenoy, 2002;Techawiboonwong & Yenradee, 2003;Mazzola et al, 1998;Sillekens et al, 2011;Zhang et al, 2012;Ramezanian et al, 2012;Chaturvedi & Bandyopadhyay, 2015;Chaturvedi, 2017Multiple Leung & Chan, 2009Leung et al, 2003;Chakrabortty & Akhtar Hasin, 2013;Entezaminia et al, 2016;Abu Bakar et al, 2016;Mehdizadeh et al, 2018 Uncertain Fuzzy Single Baykasoglu, 1999;Wang & Fang, 2000;Fung et al, 2003;Tang et al, 2000;Tang et al, 2003;Ning et al, 2006;Aliev et al, 2007;Chen & Huang, 2010;Iris & Cevikcan, 2014;Rahmani et al, 2014;Chakrabortty et al, 2015Multiple Wang & Fang, 1997Baykasoglu & Gocken, 2006;Sakallı et al, 2010;Baykasoglu & Gocken, 2010;Sadeghi et al, 2013;da Silva & Silva Marins, 2014;Gholamian et al, 2016;Fiasché et al, 2016;Chauhan et al, 2017;…”
Section: Objective Function Articlesmentioning
confidence: 99%