“…Clogging is a phenomenon that occurs because cohesive materials tend to adhere to cutting tools at the cutterhead, openings of the cutterhead, screw conveyor, or conveyor belt. This, in turn, can lead to severe problems in tunnelling projects, including excavation difficulties, an extension of the project timetable and, consequently, budget overrun (Thewes, 1999;Spagnoli et al, 2014;Thewes and Hollmann, 2014;Zumsteg et al, 2016;Oliveira, 2018). Clogging is a result of the attraction between soil particles and a foreign object, as well as adhesion between water in the soil and the object (Fountaine, 1954;Lal and Shukla, 2004;Zhang et al, 2018).…”