Asia Communications and Photonics Conference and Exhibition 2010
DOI: 10.1109/acp.2010.5682500
|View full text |Cite
|
Sign up to set email alerts
|

Migration towards Fibre to the Home: Key cost factors

Abstract: this paper presents a comprehensive cost model for migration towards FTTH, and the most important cost factors for operators to consider in order to increase the profitability of networks.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…However, study of the migration process and the cost involved has been hardly addressed. In [11] a time-step migration planning from a Greenfield or asymmetric digital subscriber line (ADSL) network toward a traditional GPON or active optical network (AON) was presented, but this model still lacks consideration of NGOA as well as the different roles of providers. In [12] a migration cost evaluation of core networks was solved using meta heuristics, but it does not include the intricacies of economic modeling.…”
Section: Introductionmentioning
confidence: 99%
“…However, study of the migration process and the cost involved has been hardly addressed. In [11] a time-step migration planning from a Greenfield or asymmetric digital subscriber line (ADSL) network toward a traditional GPON or active optical network (AON) was presented, but this model still lacks consideration of NGOA as well as the different roles of providers. In [12] a migration cost evaluation of core networks was solved using meta heuristics, but it does not include the intricacies of economic modeling.…”
Section: Introductionmentioning
confidence: 99%