Microseismic Monitoring of the Left Bank Slope at the Baihetan Hydropower Station, China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
17
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 64 publications
(17 citation statements)
references
References 13 publications
0
17
0
Order By: Relevance
“…In the design of rock engineering structures, understanding and preventing rock fracture initiation and propagation are significant for maintaining structural stability and for avoiding geologic hazards. [1][2][3] On the other hand, in the rock engineering applications related to cutting, fragmentation, and hydraulic fracturing, methods are sought to improve rock-breaking efficiency. For these purposes, rock fracture mechanics has been established and quickly developed.…”
Section: Introductionmentioning
confidence: 99%
“…In the design of rock engineering structures, understanding and preventing rock fracture initiation and propagation are significant for maintaining structural stability and for avoiding geologic hazards. [1][2][3] On the other hand, in the rock engineering applications related to cutting, fragmentation, and hydraulic fracturing, methods are sought to improve rock-breaking efficiency. For these purposes, rock fracture mechanics has been established and quickly developed.…”
Section: Introductionmentioning
confidence: 99%
“…The characteristics of the main interlayer rock mass and faults are listed in Tables 1 and 2, respectively. According to in situ stress measurements, the maximum principal stress is σ 1 = 8-11 MPa, the medium principal stress is σ 2 = 7-9 MPa, and the minimum principal stress is σ 3 = 6-8 MPa [25][26][27].…”
Section: Project Overviewmentioning
confidence: 99%
“…The MS monitoring system produced by the Engineering Seismology Group, Canada was adopted in the project. The system was installed completely on 10 November 2014 [27,30]. The multipoint extensometers were successfully installed and commissioned on 14 December 2014.…”
Section: Ms Parameter Embeddingmentioning
confidence: 99%
“…Microseismic (MS) monitoring technology, as an advanced dynamic disaster monitoring method, has been widely used in deep-buried tunnels [1], coal mines [2], underground chambers [3], rock slopes [4] and other engineering fields. Sensors are used to receive vibration signals induced by mass rock rupture.…”
Section: Introductionmentioning
confidence: 99%