2015
DOI: 10.22260/isarc2015/0021
|View full text |Cite
|
Sign up to set email alerts
|

Methods for Simulating Crane-Deployment Plans Used in Construction of Nuclear Power Plants

Abstract: To construct nuclear power plants no later than delivery dates for certain, Hitachi adopts the "opentop construction method." This method requires civil and mechanical installation works to be carried out concurrently. Therefore, civil and mechanical contractors must share cranes for carrying in materials such as rebar, piping components, and equipment. First, civil contractors make cranedeployment plans, which consist of crane locations, load capacities, and its operation schedule. Since it is difficult to es… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…As examples of recent BIM, Zhang et al developed safety checking platform that detects the opening in a 3D model and automatically places guardrails for preventing fall-related accidents [2]. Sugimoto et al developed a simulation system for quantitatively evaluating the validity of cranedeployment plans by integrating 3D models and a time dimension [3].…”
Section: Introductionmentioning
confidence: 99%
“…As examples of recent BIM, Zhang et al developed safety checking platform that detects the opening in a 3D model and automatically places guardrails for preventing fall-related accidents [2]. Sugimoto et al developed a simulation system for quantitatively evaluating the validity of cranedeployment plans by integrating 3D models and a time dimension [3].…”
Section: Introductionmentioning
confidence: 99%