Day 1 Tue, September 21, 2021 2021
DOI: 10.2118/206215-ms
|View full text |Cite
|
Sign up to set email alerts
|

Methodology to Remediate and Evaluate Surface Flowline Capacity with Coiled Tubing Cleanouts

Abstract: Customers in Ecuador inject the byproduct formation water from production wells into injector wells. A limited injection rate bottlenecks production, which is economically undesirable. Two major contributors limit injection capacity: reservoir injectivity and flowline pressure losses. In the latter case, paraffins, asphaltenes, and scale, collectively referred to as "schmoo," progressively build in the flowline and reduce the internal diameter, limiting flow rate capacity. One cost-effective method to remediat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 9 publications
0
0
0
Order By: Relevance