2018
DOI: 10.2478/ttj-2018-0005
|View full text |Cite
|
Sign up to set email alerts
|

Methodology of Selection of Heavy and Oversized Freight Transportation System

Abstract: Dynamically changing economic conditions influence the growing demand of various freights transportation. Inevitably, the demand for heavy and oversized freight transportation is increasing, which is quite problematic. In many cases, it is very difficult to standardize the technology of heavy and oversized freight transportation. Decisions are necessary, which would allow to deliver heavy or oversized freight to the destination place, allocating fewer funds as possible for infrastructure improvements, choosing… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0
3

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 21 publications
(18 citation statements)
references
References 32 publications
(12 reference statements)
0
15
0
3
Order By: Relevance
“…To achieve this objective, the structure of the logistics systems was identified and the most substantial cost elements in the logistics subsystems were defined. Petraška et al (2017Petraška et al ( , 2018 proposed a methodology, which would allow to deliver heavy or oversized freight to the destination, allocating the least possible amount of funds for infrastructure improvements, choosing the most appropriate mode of transport for this type of freight transportation or using the advantages of multimodal (combined) transport. Ji et al (2018) studied the logistics scheduling problem in the context of a three-stage supply chain where the objective is to minimise the sum of the total weighted inventory cost and transport cost.…”
Section: Literature Reviewmentioning
confidence: 99%
“…To achieve this objective, the structure of the logistics systems was identified and the most substantial cost elements in the logistics subsystems were defined. Petraška et al (2017Petraška et al ( , 2018 proposed a methodology, which would allow to deliver heavy or oversized freight to the destination, allocating the least possible amount of funds for infrastructure improvements, choosing the most appropriate mode of transport for this type of freight transportation or using the advantages of multimodal (combined) transport. Ji et al (2018) studied the logistics scheduling problem in the context of a three-stage supply chain where the objective is to minimise the sum of the total weighted inventory cost and transport cost.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Authors of study [1] propose an approach to identification of characteristics of objects of configuration of project products. Works [2][3][4][5] are about improvement of efficiency of using of project configuration objects by different criteria (cost, environmental impact, etc.). Works [6][7][8] take into account features of the use of configuration objects in projects.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…http://www.ijmp.jor.br v. 10, n. 4, Special Edition IFLOG 2018 ISSN: 2236-269X DOI: 10.14807/ijmp.v10i4.999 kind of transport; it is important to make decisions in order to benefit from the best performance involving costs and the available infrastructure (PETRAŠKA et al, 2018).…”
Section: Independent Journal Of Management and Production (Ijmandp)mentioning
confidence: 99%