2013
DOI: 10.1109/tpwrs.2012.2207971
|View full text |Cite
|
Sign up to set email alerts
|

Methodology for evaluation of grid-tie connection of distributed energy resources - Case study with photovoltaic and energy storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
19
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 28 publications
(21 citation statements)
references
References 19 publications
0
19
0
Order By: Relevance
“…The time series Uniform Singapore Energy Price (USEP) in year 2010 in $/MWH is the primary information used in modelling to analyze the annual electricity cost, as shown in (9). USEP is the energy purchase paid by retailers.…”
Section: E Annual Energy Cost Considerationmentioning
confidence: 99%
See 2 more Smart Citations
“…The time series Uniform Singapore Energy Price (USEP) in year 2010 in $/MWH is the primary information used in modelling to analyze the annual electricity cost, as shown in (9). USEP is the energy purchase paid by retailers.…”
Section: E Annual Energy Cost Considerationmentioning
confidence: 99%
“…The USEP time series of year 2010 can be convoluted with a load duration curve (LDC), conventional & solar power generation, energy storage (ES) time series, as shown in (9) to yield annual energy cost expected, where, only ሼሺS ୬ െ X% * L ୬ ሻ > 0ሽ in time series are considered. α(S n , X%, L n ) is the annual energy cost in S$, β n is USEP in S$/MWH, DR is demand response signal, is n th interval of ES Charge, is n th interval of ES Discharge, is ES maximum storage in MWH, is ES minimum storage in MWH, m is PV PIC ranging from 0~50% of total generation capacity, S n is n th interval PV power from solar irradiance, X% is percentage of maximum allowable PV energy to meet the load demand, L n is n th interval LDC, CD n is n th interval Energy Storage (ES) charging / discharging limit, k is total interval of reliability simulation, and j is percentage of demand.…”
Section: E Annual Energy Cost Considerationmentioning
confidence: 99%
See 1 more Smart Citation
“…By employing DG units that are distributed near load centers, distribution system reliability will be obviously improved. Furthermore, many nations are following a strategy to increase the use of renewable DG units due to environmental pollution and the limitation of fossil fuels resources .…”
Section: Introductionmentioning
confidence: 99%
“…Although many studies have been done on the power generating plants concerning generation dispatching [4,5,6], maintenance scheduling [7,8,9] and renewable energy integration [10], little attention has been paid to the power plants' contracted coal mines [11]. The focus of this study is to improve energy efficiency of the power station contracted coal mines so that the mine itself and the power station can benefit from such improvement.…”
Section: Introductionmentioning
confidence: 99%