2012
DOI: 10.1109/tste.2012.2208207
|View full text |Cite
|
Sign up to set email alerts
|

Methodologies to Determine Operating Reserves Due to Increased Wind Power

Abstract: Power systems with high wind penetration experience increased variability and uncertainty, such that determination of the required additional operating reserve is attracting a significant amount of attention and research. This paper presents methods used in recent wind integration analyses and operating practice, with key results that compare different methods or data. Wind integration analysis over the past several years has shown that wind variability need not be seen as a contingency event. The impact of wi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
98
0
1

Year Published

2015
2015
2022
2022

Publication Types

Select...
8
2

Relationship

2
8

Authors

Journals

citations
Cited by 257 publications
(99 citation statements)
references
References 21 publications
0
98
0
1
Order By: Relevance
“…Thus, this work contributes to: (i) a better understanding of the main meteorological features behind the wind power ramp events, and (ii) assessing the capabilities of windstorm/cyclone detection algorithms [10,11] to identify wind power ramps as well as their main impacts on the wind power production. Understanding the role of such phenomena will allow to: (i) minimize the impact of large-scale wind power integration within a power system; and (ii) develop reliable operational diagnostic tools for wind power ramps [5,12,13] that can be easily integrated into the decision making process by a TSO [5].…”
Section: Introductionmentioning
confidence: 99%
“…Thus, this work contributes to: (i) a better understanding of the main meteorological features behind the wind power ramp events, and (ii) assessing the capabilities of windstorm/cyclone detection algorithms [10,11] to identify wind power ramps as well as their main impacts on the wind power production. Understanding the role of such phenomena will allow to: (i) minimize the impact of large-scale wind power integration within a power system; and (ii) develop reliable operational diagnostic tools for wind power ramps [5,12,13] that can be easily integrated into the decision making process by a TSO [5].…”
Section: Introductionmentioning
confidence: 99%
“…In this light, the following dual-stage optimisation formulation is proposed for utilisation of solar PV to contribute to the system demand at peak times, which is developed based on the relevant optimisation in [39,40]. The first stage in Equations (19) and (20) determines the minimum daily peak demand that can be achieved, while the second stage minimises the energy charged to achieve the minimum daily peak demand.…”
Section: Peak Clipping Operationmentioning
confidence: 99%
“…This increased uncertainty burdens an ISO with reserve operations more so than in the past [15][16][17]. Several electricity markets have attempted to impose penalty costs on participants when their actual consumption/generation was outside a specified range around the energy bid [18][19][20][21].…”
Section: Microgrid Islanding Limited To Market Operationmentioning
confidence: 99%