The platform will undergo maintenance on Sep 14 at about 7:45 AM EST and will be unavailable for approximately 2 hours.
2014
DOI: 10.1016/j.jclepro.2013.10.056
|View full text |Cite
|
Sign up to set email alerts
|

Method to analyse the contribution of material's sensitivity in buildings' environmental impact

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
40
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 83 publications
(44 citation statements)
references
References 32 publications
(28 reference statements)
0
40
0
1
Order By: Relevance
“…As a result, the following life cycle stages are considered: (i) the production stage (modules A1-A3), (ii) the use stage (modules B2 maintenance, B4 replacement, and B6 operational energy use), and (iii) the End of Life (EoL) stage (modules C1-C4). Based on the literature survey and reports of LCA practitioners, the construction processes are less relevant in the LCA of building components than the operational ones [37,[52][53][54]. The distinction between modules B2 (maintenance), B3 (repair), B4 (replacement) is considered according to EeBGuide guidance recommendations [55].…”
Section: Goal and Scope Definitionmentioning
confidence: 99%
See 3 more Smart Citations
“…As a result, the following life cycle stages are considered: (i) the production stage (modules A1-A3), (ii) the use stage (modules B2 maintenance, B4 replacement, and B6 operational energy use), and (iii) the End of Life (EoL) stage (modules C1-C4). Based on the literature survey and reports of LCA practitioners, the construction processes are less relevant in the LCA of building components than the operational ones [37,[52][53][54]. The distinction between modules B2 (maintenance), B3 (repair), B4 (replacement) is considered according to EeBGuide guidance recommendations [55].…”
Section: Goal and Scope Definitionmentioning
confidence: 99%
“…Indeed, neglecting uncertainties and variabilities of various life cycle parameters and scenarios may affect the results' reliability and robustness for final decisions.In the state of the art, several studies in the building field deal with "probabilistic" approaches to LCA [31][32][33][34]. Some works especially focus on materials or structural components, mainly addressing parameter uncertainties, which can be traced from more than one source, such as material quantities, the unitary environmental impact of materials, heat transmission losses, service life (SL) estimation, etc.For instance, Hoxha et al investigated the impact of construction materials uncertainties on LCA reliability in few works [35][36][37]. In [37], the authors used the statistical method to identify parameters having the greatest contribution to the uncertainty of the final result.…”
mentioning
confidence: 99%
See 2 more Smart Citations
“…In most of the previous studies on uncertainty in LCA, the focus has been on the uncertainties in the emission factors. However, as discussed in Section 2, other sources of uncertainty, such as the variability of the expected service life of components and amount of materials play an important role and have a significant influence on the results (Aktas, 2011;Hoxha, Habert, Chevalier, Bazzana, & Le Roy, 2014). In order to illustrate the consequences of considering uncertainty in different categories of input factors, Monte Carlo simulations have been carried out and uncertainties have been included at various levels: (1) for emission factors only; (2) for emission factors and material amounts; (3) emission factors, material amounts and expected service life.…”
Section: Monte Carlo Simulationsmentioning
confidence: 99%