2020
DOI: 10.2172/1698024
|View full text |Cite
|
Sign up to set email alerts
|

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2020)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
3
1

Relationship

3
1

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Summarizing the FY 2019 version of this report, new hardware was installed to de-centralize METL controls (7). The data acquisition/control was separated into (3) tasks that include main operations, surface and subsurface.…”
Section: Metl Supervisory Control and Data Acquisition (Scada) System Overhaulmentioning
confidence: 99%
“…Summarizing the FY 2019 version of this report, new hardware was installed to de-centralize METL controls (7). The data acquisition/control was separated into (3) tasks that include main operations, surface and subsurface.…”
Section: Metl Supervisory Control and Data Acquisition (Scada) System Overhaulmentioning
confidence: 99%
“…The GTA is the first test article designed for testing in the Mechanisms Engineering Test Facility (METL). Current information of the METL facility can be found in ANL-ART-210/ANL-METL-24 "Mechanisms Engineering Test Loop (METL) Operations and Testing Report -FY2020" [1].…”
Section: Introduction Gear Test Assemblymentioning
confidence: 99%