2020
DOI: 10.1088/1755-1315/546/4/042026
|View full text |Cite
|
Sign up to set email alerts
|

Mechanism of migration and settlement for temporary plugging ball in shale gas horizontal wells

Abstract: In order to determine the migration and settlement mechanism of temporary plugging balls in horizontal wells, the rules for distribution, migration and settlement of balls in different location were researched through calculation, coupling fracturing fluid and characteristics of movement based on CFD (computational fluid dynamics), DEM (discrete element method) and DDPM (dense discrete phase model), and the intensity, plane and spatial distribution of the microseismic events before and after ball-addition were… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Generally, a remote delivery device needs to be installed separately during the construction of the temporary plugging ball, and it needs to be delivered manually. Moreover, the migration distance of the temporary plugging ball fracture is short of the formation, and most of it acts on the fracture opening or in the middle. Most of the common gel-type temporary plugging agents use a gel breaker to break the gel. , This gel breaking method causes great damage to the reservoir, and the gel breaking time should not be controlled. , The autonomous thermal degradation of the gel at reservoir temperature is the development trend of the gel temporary plugging agent. Compared with the temporary plugging ball, the supramolecular gel temporary plugging agent can simplify the construction method, and by entering the far end of the fracture to achieve temporary plugging in the deep part of the fracture, it can improve the construction efficiency, increase the complexity of the fracture, and prevent well channeling.…”
Section: Introductionmentioning
confidence: 96%
“…Generally, a remote delivery device needs to be installed separately during the construction of the temporary plugging ball, and it needs to be delivered manually. Moreover, the migration distance of the temporary plugging ball fracture is short of the formation, and most of it acts on the fracture opening or in the middle. Most of the common gel-type temporary plugging agents use a gel breaker to break the gel. , This gel breaking method causes great damage to the reservoir, and the gel breaking time should not be controlled. , The autonomous thermal degradation of the gel at reservoir temperature is the development trend of the gel temporary plugging agent. Compared with the temporary plugging ball, the supramolecular gel temporary plugging agent can simplify the construction method, and by entering the far end of the fracture to achieve temporary plugging in the deep part of the fracture, it can improve the construction efficiency, increase the complexity of the fracture, and prevent well channeling.…”
Section: Introductionmentioning
confidence: 96%