2012
DOI: 10.1007/s11771-012-1315-8
|View full text |Cite
|
Sign up to set email alerts
|

Mechanism and experiment of substituting high drainage roadway with directional long drilling group to extract pressure-relief gas

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 13 publications
(13 citation statements)
references
References 8 publications
0
13
0
Order By: Relevance
“…However, it has become a trend that adopting LHB extraction method replaces the three methods to extract the pressure-relief gas, because it has the advantages of cost effectiveness, long extraction time, and high construction efficiency (Xie et al 2012;Johnny et al 2017). However, owing to the horizontal arrangement of the LHB and small diameter (about 100 mm) and extraction radius, the requirements of overburden layer for the layout of the LHB are more stringent.…”
Section: Introductionmentioning
confidence: 99%
“…However, it has become a trend that adopting LHB extraction method replaces the three methods to extract the pressure-relief gas, because it has the advantages of cost effectiveness, long extraction time, and high construction efficiency (Xie et al 2012;Johnny et al 2017). However, owing to the horizontal arrangement of the LHB and small diameter (about 100 mm) and extraction radius, the requirements of overburden layer for the layout of the LHB are more stringent.…”
Section: Introductionmentioning
confidence: 99%
“…When two SLL panels are mined out (Figure 14(b)), the vertical fracture ring above the two ends of the mining area is higher and more sufficient just like a supercritical longwall panel with great panel length. is is a strong scientific foundation for gas flow and drainage using gob wells or cross measure boreholes [29]. While in CLL, two independent rings are developed above two ends of each panel, and the height of the rings is roughly the same with that of the first single SLL panel (Figure 14(c)).…”
Section: Seam Roof Influence Zhiqiang Wangmentioning
confidence: 98%
“…Liu Zegong et al [12] conducted a comprehensive study on the key technologies involved in the extraction of goaf gas through a high roadway as well as the principles of the high roadway layout. In addition to the aforementioned studies, other studies on pressurized gas extraction have been conducted [13][14][15][16]. Currently, all high drainage roadways are located in the fractured zone beside the air-return roadway.…”
Section: Proposed Layout Of Lateral High Drainage Roadwaymentioning
confidence: 99%