2021
DOI: 10.1016/j.tust.2021.104044
|View full text |Cite
|
Sign up to set email alerts
|

Mechanical responses in the construction process of super-large cross-section tunnel: A case study of Gongbei tunnel

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 30 publications
(9 citation statements)
references
References 34 publications
1
8
0
Order By: Relevance
“…5. (b), the development trend of surrounding rock pressure shows a rapid increase and then a gradually stable trend, which is similar to the monitoring results of Luo et al, Zhou et al, Zhao et al and others [19,42,45]. The uctuation section in the middle of the time history curve is mainly caused by step excavation.…”
Section: Analysis Of Mechanical 331 Surrounding Rock Pressuresupporting
confidence: 86%
“…5. (b), the development trend of surrounding rock pressure shows a rapid increase and then a gradually stable trend, which is similar to the monitoring results of Luo et al, Zhou et al, Zhao et al and others [19,42,45]. The uctuation section in the middle of the time history curve is mainly caused by step excavation.…”
Section: Analysis Of Mechanical 331 Surrounding Rock Pressuresupporting
confidence: 86%
“…In the process of shield construction, the ground settlement should be strictly controlled to ensure the normal operation of ground tra c and the safety of the surrounding environment. e stratum where the shield tunnel is located is mainly silty clay and silty sand [13].…”
Section: Project Summarymentioning
confidence: 99%
“…The fact that the construction of underground tunnels [1] is still mainly carried out manually on site poses various problems or limitations. On the one hand, many tunnel workers are susceptible to occupational diseases due to the dust and lack of direct sunlight in the tunnels; on the other hand, it is difficult to send the appropriate professionals to the site to control the tunnels in some special cases, which requires someone to guide or help remotely.…”
Section: Introductionmentioning
confidence: 99%