2021
DOI: 10.21203/rs.3.rs-184308/v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Mechanical aspects of construction of new TBM tunnel under existing structures

Abstract: It is inevitable for the construction of subways to pass under the existing structures in the city; this will cause settlement of the existing structures and affect their safety. The soil is a complex mixture, and hence it is difficult to determine the damage caused by construction using tunnel boring machine (TBM) method to the stress balance of the surrounding soil. Normally, settlement and uplift of the surface are caused during tunneling. Therefore, large-scale 3D simulations are needed to study the intera… Show more

Help me understand this report
View published versions

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 24 publications
0
1
0
Order By: Relevance
“…Relying on the Ma Wan cross-sea passage project, Chen Xiaoping et al constructed a rapid evaluation model for cross-sea tunnel route selection using AHP [7]. Additionally, some studies have used traditional numerical calculation methods to establish small-scale engineering models and simulate the excavation process of linear underground space projects to analyze the safety of the surrounding structures during excavation [8][9][10]. Xu et al used FLAC3D to establish a model of Beijing Subway Line 6 passing beneath Chaoyangmen Station and studied the deformation patterns of the existing station [11].…”
mentioning
confidence: 99%
“…Relying on the Ma Wan cross-sea passage project, Chen Xiaoping et al constructed a rapid evaluation model for cross-sea tunnel route selection using AHP [7]. Additionally, some studies have used traditional numerical calculation methods to establish small-scale engineering models and simulate the excavation process of linear underground space projects to analyze the safety of the surrounding structures during excavation [8][9][10]. Xu et al used FLAC3D to establish a model of Beijing Subway Line 6 passing beneath Chaoyangmen Station and studied the deformation patterns of the existing station [11].…”
mentioning
confidence: 99%