1998
DOI: 10.1080/1023697x.1998.10667770
|View full text |Cite
|
Sign up to set email alerts
|

Measuring Instruments in Chiller Plants and Uncertainties in Performance Evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2001
2001
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Implementation of the optimization control for chiller plants requires that the plants are equipped with adequate instrumentation for measuring operating parameters of equipment and that the measured records are analyzed regularly. 15 Reliable ®eld data from proper instrumentation to chiller plants are essential to evaluate the actual performance. Then, by comparing the performance lines of actual data and simulated data, it is possible to remove problems of improper operation or unsatisfactory control of the system.…”
Section: Consideration Of Operating Ef®ciency In Relation To the Load And Outdoor Temperaturementioning
confidence: 99%
“…Implementation of the optimization control for chiller plants requires that the plants are equipped with adequate instrumentation for measuring operating parameters of equipment and that the measured records are analyzed regularly. 15 Reliable ®eld data from proper instrumentation to chiller plants are essential to evaluate the actual performance. Then, by comparing the performance lines of actual data and simulated data, it is possible to remove problems of improper operation or unsatisfactory control of the system.…”
Section: Consideration Of Operating Ef®ciency In Relation To the Load And Outdoor Temperaturementioning
confidence: 99%
“…Unfortunately, few buildings in Hong Kong are equipped with sufficient energy meters that will allow air-conditioning electricity consumption to be determined to an acceptable level of accuracy. 7,8 In view of this, computer simulation was also adopted for assessing existing buildings under HK-BEAM.…”
Section: Simplified Model For Predicting Air-conditioning Electricity Usementioning
confidence: 99%
“…As both combinations offer similar 'goodness of fit' in terms of the coefficient of determination (r 2 ), it was uncertain which combination would give the best correlation. A further analysis on the multicollinearity (near linear dependence) between all the independent variables selected in the three procedures were checked by examining the vari-ance inflation factor (VIF) of the selected independent variables, 14 where: (8) In Equation ( 8), r i 2 denotes the coefficient of multiple determination for the ith independent variable when regressed on the remaining independent variables. A high VIF value points to collinearity, and inclusion of variables that have a significant collinearity with other variables in a multiple linear regression model would affect the prediction accuracy of the model, and should be avoided.…”
Section: Multiple Regression Analysismentioning
confidence: 99%