2019
DOI: 10.3390/en12102020
|View full text |Cite
|
Sign up to set email alerts
|

Measured Performance of a Mixed-Use Commercial-Building Ground Source Heat Pump System in Sweden

Abstract: When the new student center at Stockholm University in Sweden was completed in the fall of 2013 it was thoroughly instrumented. The 6300 m2 four-story building with offices, a restaurant, study lounges, and meeting rooms was designed to be energy efficient with a planned total energy use of 25 kWh/m2/year. Space heating and hot water are provided by a ground source heat pump (GSHP) system consisting of five 40 kW off-the-shelf water-to-water heat pumps connected to 20 boreholes in hard rock, drilled to a depth… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 41 publications
(23 citation statements)
references
References 38 publications
(44 reference statements)
0
23
0
Order By: Relevance
“…This difference is sometimes referred to as the building energy "performance gap" (de Wilde 2014). Spitler and Gehlin (2019) reviewed some of the work exploring the performance gap based on energyuse intensity (EUI). The results are eye-opening, to say the least.…”
Section: Editorialmentioning
confidence: 99%
“…This difference is sometimes referred to as the building energy "performance gap" (de Wilde 2014). Spitler and Gehlin (2019) reviewed some of the work exploring the performance gap based on energyuse intensity (EUI). The results are eye-opening, to say the least.…”
Section: Editorialmentioning
confidence: 99%
“…The ground heat exchanger length is an important performance factor for the GSHP system, and most GSHP system design software is used to calculate the required length of ground heat exchanger. Most studies, however, have been conducted through the numerical analysis or the transient analysis of TRT [13][14][15][16]. Few studies [16] have examined the performance change according to the length of ground heat exchanger through real-scale experiments.…”
Section: Performance Comparison According To the Ghex Lengthmentioning
confidence: 99%
“…In the previous studies, performance analysis of various performance factors of the GSHP system was performed. [5][6][7][8][9][10][11][12][13][14][15][16]. However, most previous studies analyze the effectiveness of the design factor through numerical simulation [5,6,8,10,11,14].…”
Section: Compare To Previous Researchmentioning
confidence: 99%
See 2 more Smart Citations