2008
DOI: 10.1130/g24130a.1
|View full text |Cite
|
Sign up to set email alerts
|

Meander cutoff and the controls on the production of oxbow lakes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
64
0

Year Published

2013
2013
2018
2018

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 135 publications
(66 citation statements)
references
References 18 publications
1
64
0
Order By: Relevance
“…We argue that acceleration of erosion occurs when sinuosity suddenly decreases, thus sinuosity could partly describe the lateral dynamics of the Morava River in the study reach. Similar conclusions could be drawn from the works of [45,46,48].…”
Section: Variables Controlling Planform Changessupporting
confidence: 86%
“…We argue that acceleration of erosion occurs when sinuosity suddenly decreases, thus sinuosity could partly describe the lateral dynamics of the Morava River in the study reach. Similar conclusions could be drawn from the works of [45,46,48].…”
Section: Variables Controlling Planform Changessupporting
confidence: 86%
“…In particular, numerous studies have used Google Earth imagery (e.g., QuickBird, IKONOS) to validate products mainly from MODIS or Landsat, at a local or global scale, including urban areas [68], taiga-tundra transition zones [69], mangrove forests [70], irrigated areas [71], channels and oxbow-lakes [72], or oases in desert regions [73]. In this study, two further layers of very high resolution images, namely RapidEye imagery and airborne cadastral orthophotos, have been employed besides Google Earth imagery to create a high precision validation layer.…”
Section: Discussionmentioning
confidence: 99%
“…Constantine and Dunne, 2008). The algorithm of modelling point-bar evolution in plan view is illustrated with an example in Fig.…”
Section: Planform Meander-bend Transformationsmentioning
confidence: 99%
“…(2) Average migration rates that control the spacing of scroll bars between these times (t 1 -t 2 and t 2 -t 3 ); (3) The prediction time (beyond t 3 ) and the associated migration rate, which will typically be based on the timing of abandonment of river reaches, for example, through neck cutoff as a river approaches its maximum sinuosity or through chute cut-off or nodal avulsion determined by the maximum growth time of meanders (Constantine and Dunne, 2008;Hooke, 2003;Slingerland and Smith, 2004 …”
Section: Planform Meander-bend Transformationsmentioning
confidence: 99%