2014
DOI: 10.1016/j.jclepro.2013.09.004
|View full text |Cite
|
Sign up to set email alerts
|

Mathematical modelling and MINLP programming of a hydro system for power generation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 3 publications
0
6
0
Order By: Relevance
“…These business units are controlled by Electro Gorenjska Kranj within the company. Producing electricity from hydro power has become a quite important necessity and cost-effective system of energy technology considering the economic, social, and environmental factors [63]. The aim of the production unit is to improve and maintain their current operations including their facilities and human resources.…”
Section: Methodsmentioning
confidence: 99%
“…These business units are controlled by Electro Gorenjska Kranj within the company. Producing electricity from hydro power has become a quite important necessity and cost-effective system of energy technology considering the economic, social, and environmental factors [63]. The aim of the production unit is to improve and maintain their current operations including their facilities and human resources.…”
Section: Methodsmentioning
confidence: 99%
“…Further model transformation is required due to the stage reduction in Section 3.1.2. Notice that j (�1, 2, 3, 4) in the intermediate model (12) refers to the first four operational stages. Here, we use symbol t to replace the corresponding j and then integrate stage t � 2, 3, 4 into the first stage (t � 1) as illustrated in Section 3.1.2. e way how to transform is similar to that in Section 3.2.1.…”
Section: 22mentioning
confidence: 99%
“…Because the random inflows fluctuate with seasons, we assume the water inflows of each candidate take the same uncertain level in each season. us, for the MSSP model, 16(�2 4 ), 256(�2 8 ), and 4096(�2 12 ) stagewise scenarios are constructed, respectively. Furthermore, according to the generation and simplification process of the scenario set displayed in Section 3.1, 16 scenarios are generated for the two-stage DE model.…”
Section: Parameters In Small-scale Experimentsmentioning
confidence: 99%
See 1 more Smart Citation
“…[11] presented a probabilistic approach for the generation reliability evaluation of municipal waste water based micro-hydro power plant. The optimal installation location of water capture within a hydropower plant was obtained in [12] using mixed-integer nonlinear programming method. Thirteen hydro-turbine system architectures were used to select the most appropriate turbine architecture for a low-head small scale hydro specification in [13].…”
Section: Introductionmentioning
confidence: 99%