2017 IEEE International Conference on Smart Grid Communications (SmartGridComm) 2017
DOI: 10.1109/smartgridcomm.2017.8340678
|View full text |Cite
|
Sign up to set email alerts
|

MAS for automated black start of multi-microgrids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(7 citation statements)
references
References 15 publications
0
7
0
Order By: Relevance
“…The agents communicate using MTC [13] so the network must support MTC. Latency of 100 ms and throughput of <1 kBps per DER are acceptable [6] for the black start use case. The autarkic microgrid black start use case illustrates how reliability of the communications system during blackout can be used to make it possible that the power system can recover from failure.…”
Section: Communication Requirements For Autarkic Microgrid Blackout Rmentioning
confidence: 99%
See 3 more Smart Citations
“…The agents communicate using MTC [13] so the network must support MTC. Latency of 100 ms and throughput of <1 kBps per DER are acceptable [6] for the black start use case. The autarkic microgrid black start use case illustrates how reliability of the communications system during blackout can be used to make it possible that the power system can recover from failure.…”
Section: Communication Requirements For Autarkic Microgrid Blackout Rmentioning
confidence: 99%
“…In this section the requirements to be fulfilled by the communications system to allow an islanded microgrid to recover on its own from blackout are developed. The autarkic microgrid blackout recovery method presented in [6] assumes that the MV/LV grid is divided into a set of microgrids (Figure 1), which can be operated in island mode and are assumed to be autarkic, meaning that they have sufficient local energy generation and storage to be self-sufficient, and autonomous, meaning that they can manage themselves, although in normal operation they may be managed by distribution grid (DG) management systems external to the microgrid. Microgrid management is performed by means of a multi-agent system (MAS), the individual agents being located at the DER sites.…”
Section: Communication Requirements For Autarkic Microgrid Blackout Rmentioning
confidence: 99%
See 2 more Smart Citations
“…There are three phases in the power restoration which are black-start [1], network reconfiguration [2] and lastly load restoration. The most important part of the power system restoration is the load restoration stage which is the focus of this research.…”
Section: Introductionmentioning
confidence: 99%