2013
DOI: 10.1016/j.esr.2013.01.006
|View full text |Cite
|
Sign up to set email alerts
|

Market integration of wind power in electricity system balancing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
38
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 51 publications
(38 citation statements)
references
References 23 publications
0
38
0
Order By: Relevance
“…The gate closure of these markets is very short, such that bids can be submitted until shortly before real time. Denmark (energinet.dk 2008, Andersen et al 2012, Sorknaes et al 2013) and The Netherlands (TenneT 2011) are examples of such energy markets. TenneT argues that this feature is a key reason for lower costs in The Netherlands compared to Germany.…”
Section: Policy Options: Lowering Entrance Barriersmentioning
confidence: 99%
See 1 more Smart Citation
“…The gate closure of these markets is very short, such that bids can be submitted until shortly before real time. Denmark (energinet.dk 2008, Andersen et al 2012, Sorknaes et al 2013) and The Netherlands (TenneT 2011) are examples of such energy markets. TenneT argues that this feature is a key reason for lower costs in The Netherlands compared to Germany.…”
Section: Policy Options: Lowering Entrance Barriersmentioning
confidence: 99%
“…The security level of 99.994% corresponds to the average availability of thermal plants that had bid in the balancing power market. Such forecasts are used in practice in Denmark, where wind power supplies balancing services (Sorknaes et al 2013). …”
Section: Providing Balancing Power With Vre Generatorsmentioning
confidence: 99%
“…TSOs in the Nordic area recognized the importance and benefits of the market integration of wind power in electricity system balancing. The analysis made in [50], where a 21 MW wind farm has been tested, showed that the wind farm is able to play a proactive role regarding downward regulation.…”
Section: Procurement Of Ancillary Servicesmentioning
confidence: 99%
“…Power plants can resubmit generation scheduling on the intraday market if prediction error exists in the day-ahead market. Power plants should pay fines for errors when the practical generating volume is less than the cleared generating volume determined on the day-ahead market and the difference in excess of f kp [28,29]. Similarly, the profit in the intraday market can be written as:…”
Section: Non-cooperative Game Among Power Plantsmentioning
confidence: 99%