2016
DOI: 10.18235/0000550
|View full text |Cite
|
Sign up to set email alerts
|

Mário Covas Rodoanel Project: Northern Section, Brazil

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…For example, the design includes seven road tunnels totaling 6.2 km and viaducts totaling 7.5 km. The 44 km construction site was divided into six areas, each of which has its own veterinarian, field biologist, and veterinary hospital (Calixter et al, 2016). Owing to the success of the initial rescue program, few animals required veterinarian treatment and most rescued animals were translocated to undisturbed, high-quality habitat patches located nearby.…”
Section: Case Study #4mentioning
confidence: 99%
“…For example, the design includes seven road tunnels totaling 6.2 km and viaducts totaling 7.5 km. The 44 km construction site was divided into six areas, each of which has its own veterinarian, field biologist, and veterinary hospital (Calixter et al, 2016). Owing to the success of the initial rescue program, few animals required veterinarian treatment and most rescued animals were translocated to undisturbed, high-quality habitat patches located nearby.…”