Marine Production Riser-A Subsystem of the Submerged Production System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1980
1980
1980
1980

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…These were (1) template installation, leveling, and pile founding; (2) pipeline connection (using two alternative methods of remote connection); (3) well drilling (using directional techniques) and well completion (using remote techniques to install and connect Christmas trees to the manifold); (4) manifold production functions; (5) remote control and safety shut-in functions; (6) maintenance manipulator operation in maintaining subsea components; (7) pumpdown tools and vertical reentry with a floating rig to service wellbores; (8) pump/separator operation; and (9) articulated riser installation and flexible component operation.…”
Section: Pilot Test Objectivesmentioning
confidence: 99%
See 1 more Smart Citation
“…These were (1) template installation, leveling, and pile founding; (2) pipeline connection (using two alternative methods of remote connection); (3) well drilling (using directional techniques) and well completion (using remote techniques to install and connect Christmas trees to the manifold); (4) manifold production functions; (5) remote control and safety shut-in functions; (6) maintenance manipulator operation in maintaining subsea components; (7) pumpdown tools and vertical reentry with a floating rig to service wellbores; (8) pump/separator operation; and (9) articulated riser installation and flexible component operation.…”
Section: Pilot Test Objectivesmentioning
confidence: 99%
“…5 One of the three wells was abandoned temporarily during completion operations because of mechanical problems with the wellbore equipment. After production start-up, the articulated production riser 6 was installed and put into operation without the use of a· drilling rig or heavy offshore construction equipment.…”
Section: Conduct Of Test Installationmentioning
confidence: 99%