2007 IEEE Particle Accelerator Conference (PAC) 2007
DOI: 10.1109/pac.2007.4441170
|View full text |Cite
|
Sign up to set email alerts
|

Manufacture and assembly of the 6-meter-long cryomodules for superconducting RF Test Facility (STF) at KEK

Abstract: A superconducting RF test facility (STF) is being constructed at KEK for R&D oriented toward the International Linear Collider (ILC). [1] Under KEK's guidance, Hitachi, Ltd. has manufactured cryostat components at its factory and completed final assembly in the STF Linac Building at KEK. The STF cryomodule consists of two cryostats, each about six meters long based on the TESLA-TTF-type III design. Each cryostat can house four 9-cell cavities, each one meter in length.[2] This report outlines the flow of manuf… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles