2016
DOI: 10.1080/00207543.2016.1162919
|View full text |Cite
|
Sign up to set email alerts
|

Managing TV commercials inventory in the Italian advertising market

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…Branch-and-bound techniques were applied to solve the problem using WINQSB software. Guerriero et al (2016) proposed a few formulations of the problem of accepting and scheduling commercials on TV. Among them, they added to the basic problem some constraints, such as avoiding product conflicts, assigning different lengths advertisements constraints, and specific breaks for commercials constraints.…”
Section: Maximising Tv-company Revenuementioning
confidence: 99%
See 2 more Smart Citations
“…Branch-and-bound techniques were applied to solve the problem using WINQSB software. Guerriero et al (2016) proposed a few formulations of the problem of accepting and scheduling commercials on TV. Among them, they added to the basic problem some constraints, such as avoiding product conflicts, assigning different lengths advertisements constraints, and specific breaks for commercials constraints.…”
Section: Maximising Tv-company Revenuementioning
confidence: 99%
“…This is only a weight characteristic and not one of effectiveness. GRP is calculated by summing up the ratings of all the advertisement airings during the entire advertising campaign (Lawrence, 1971, Araman and Popescu, 2010, Guerriero et al, 2016.…”
Section: Problem Definitionmentioning
confidence: 99%
See 1 more Smart Citation
“…A generalization of this work has been considered by Ghassemi‐Tari and Alaei (). Guerriero, Miglionico, and Olivito () consider the scheduling problem of an Italian television network where the network decides whether to accept the scheduling requests of clients with both rating points and budget requirements, and propose several heuristics to solve the resulting problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In additions, the distributed model predictive control is also used to solve the optimal advertising strategy problem (Pourkargar et al, 2017a,b). For further discussion on various literature results, the reader may refer to the works of, for example, Hamilton (2009), Huang et al (2012), Chutani and Sethi (2012), García-Villoria and Salhi (2015), Lu et al (2016), Guerriero et al (2016), Schroeder and Tremblay (2016), Fang and Li (2015) and references therein.…”
Section: Introductionmentioning
confidence: 99%