SPE/IATMI Asia Pacific Oil &Amp; Gas Conference and Exhibition 2020
DOI: 10.2118/196478-ms
|View full text |Cite
|
Sign up to set email alerts
|

Managing Platform Start Up Flow Assurance With an Integrated Transient Modelling Advisor ITMA

Abstract: In old, mature fields with declining production and timeworn facility equipment, transient flow problems like slug and surge issues tend to appear during operations, especially during platform start up (PSU) processes where flowrates, pressures, and temperatures are constantly and significantly changing, which can lead to unstable production. Such situations may cause longer production stabilization time and potentially trip the entire facility if not managed properly. To mitigate this, a methodology for an in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?