2020
DOI: 10.17580/em.2020.01.08
|View full text |Cite
|
Sign up to set email alerts
|

Managing mining enterprise productivity by open pit reconstruction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(7 citation statements)
references
References 4 publications
0
3
0
1
Order By: Relevance
“…First of all, the domestic germanium market can include producers of germanium coke chemical concentrate, companies developing coal deposits with category "B" (deposits with significant concentrations of germanium), as well as enterprises that produce germanium ash concentrate. In the second and third stages, the market can be composed of enterprises processing germanium raw materials and enterprises consuming germanium and its compounds, which respectively produce hightech products with high added value [18].…”
Section: Resultsmentioning
confidence: 99%
“…First of all, the domestic germanium market can include producers of germanium coke chemical concentrate, companies developing coal deposits with category "B" (deposits with significant concentrations of germanium), as well as enterprises that produce germanium ash concentrate. In the second and third stages, the market can be composed of enterprises processing germanium raw materials and enterprises consuming germanium and its compounds, which respectively produce hightech products with high added value [18].…”
Section: Resultsmentioning
confidence: 99%
“…The criterion for assessing the effectiveness of the proposed mining system is the specific cost for strip-mining of 1 m 3 [19,20,21,22]. Therefore, we will calculate all cost items for this stripping site, and based on the obtained data, construct a histogram for calculating unit costs for mining the Zakhidnyi Quarry No.1 site (Fig.…”
Section: Economic Assessment Of the Proposed Mining Systemmentioning
confidence: 99%
“…The mining of overburden benches [24] is carried out by Caterpillar 365С and Caterpillar 345СL excavators with a shovel volume of 4.8 and 3.2 m 3 , respectively. Rocks from external overburden are haulage to the internal dumps [25] of the pit by Caterpillar 735 dump trucks with a carrying capacity of 32.7 tons, where they are dumped separately from each other in the same order as before development.…”
Section: The Choice Of Object To Studymentioning
confidence: 99%