Day 1 Tue, October 12, 2021 2021
DOI: 10.2118/206602-ms
|View full text |Cite
|
Sign up to set email alerts
|

Managing Gas Well Blowouts: Case Studies from Assam-Arakan & Krishna-Godavari Basin

Abstract: E&P activities are the early stage of energy production and pivotal for generating and sustaining economic growth. However, negligence and evaluating the circumstances incorrectly during these operations can lead to calamities like blowouts. This paper discusses two such tragedies, the Pasarlapudi (Krishna-Godavari) Gas Well Blowout of 1995 & Baghjan (Assam-Arakan) Oil Field Blowout of 2020, and provides possible well control measures and lessons learned. Pasarlapudi blowout incident occ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…There was also a plan to drill Extended Reach Drilling (ERD) wells to target the prospective sand below the Dibru-Saikhowa National Park itself, which is about 1 km away from the main Baghjan eld and among the others; well no.5 was included as a base for ERD (ERD Justi cation 2017). To avoid this, it was decided to start a workover operation to shut or plug this zone permanently and produce from another sand zone, i.e., Lakadong + Therria sand at 3,739 m (Bharadwaj et al 2021a). The Ahmedabad-based rm M/s-John Energy Ltd was deployed in April 2020 to carry out the workover operation.…”
Section: Prior Eventsmentioning
confidence: 99%
“…There was also a plan to drill Extended Reach Drilling (ERD) wells to target the prospective sand below the Dibru-Saikhowa National Park itself, which is about 1 km away from the main Baghjan eld and among the others; well no.5 was included as a base for ERD (ERD Justi cation 2017). To avoid this, it was decided to start a workover operation to shut or plug this zone permanently and produce from another sand zone, i.e., Lakadong + Therria sand at 3,739 m (Bharadwaj et al 2021a). The Ahmedabad-based rm M/s-John Energy Ltd was deployed in April 2020 to carry out the workover operation.…”
Section: Prior Eventsmentioning