2001
DOI: 10.1007/978-1-4757-3357-0_1
|View full text |Cite
|
Sign up to set email alerts
|

Managing and Preventing Delays in Railway Traffic by Simulation and Optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
6
0

Year Published

2012
2012
2017
2017

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(6 citation statements)
references
References 2 publications
0
6
0
Order By: Relevance
“…[1,3,4,5,9,10,12]). Most of them aim at one general objective like minimizing 1 This section is an abbreviated version of [21], section 1.…”
Section: Optimization Of Tram Schedulesmentioning
confidence: 99%
See 1 more Smart Citation
“…[1,3,4,5,9,10,12]). Most of them aim at one general objective like minimizing 1 This section is an abbreviated version of [21], section 1.…”
Section: Optimization Of Tram Schedulesmentioning
confidence: 99%
“…vehicle delay (see [10,12]) or maximizing robustness to restrict the global impact of small, local disturbances (see [4,5]). Others use a combination of objectives, like operational prot and robustness in [3], or combining social opportunity cost and operational cost in [11].…”
Section: Optimization Of Tram Schedulesmentioning
confidence: 99%
“…[1,3,4,7,16,17,18]). Most of them aim at one general objective like minimizing vehicle delay (see [16,18]) or maximizing robustness to restrict the global impact of small, local disturbances (see [4,7]). Others use a combination of objectives, like operational profit and robustness in [3], or combining social opportunity cost and operational cost in [17].…”
Section: Optimization Of Tram Schedulesmentioning
confidence: 99%
“…Simulation modeling approaches have been used extensively in transportation applications as a exible and powerful method to evaluate the robustness and reliability of the system (see [2,[6][7][8][9][10][11][12][13][14]). However, despite the fact that the train-rescheduling problem has been analyzed extensively, a limited research has been directed to the combination of simulation platforms with advanced search techniques to solve train-rescheduling problems under uncertainty.…”
Section: Introductionmentioning
confidence: 99%