2021
DOI: 10.30657/pea.2021.27.21
|View full text |Cite
|
Sign up to set email alerts
|

Management optimizing the costs and duration time of the process in the production system

Abstract: This article proposes a method to support decision making from a cost management perspective in the initial stage of production planning. In a research analyzed the problem of selecting production resources for order realization. The research was based on computer simulation. The developed model focuses on the planning of the production process in the event that the products have not yet been produced and it is necessary to decide where to produce it (with what production resources) so that the total productio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 24 publications
(20 citation statements)
references
References 34 publications
(32 reference statements)
0
15
0
Order By: Relevance
“…2. An increase in economic autonomy of a subject results in growth of personal interest of workers, which in turn leads to a decrease in expenses and an increase in labor output including optimization of all types of resources [28]. To assess the influence of all identified factors on the efficiency of work of MRO service units expert opinion poll has been carried out.…”
Section: Resultsmentioning
confidence: 99%
“…2. An increase in economic autonomy of a subject results in growth of personal interest of workers, which in turn leads to a decrease in expenses and an increase in labor output including optimization of all types of resources [28]. To assess the influence of all identified factors on the efficiency of work of MRO service units expert opinion poll has been carried out.…”
Section: Resultsmentioning
confidence: 99%
“…However, once with the start of the industrial revolution, and in particular with the introduction of the assembly line, production transformed into a complex system consisting of many pieces of equipment, many operations and activities, and involving many people interacting with each other [47][48][49][50]. Optimizing the process using the simulation method means finding the best configuration of input variables that will reflect the highest efficiency and stability of the process [51,52]. And the optimization itself usually consists in maximizing or minimizing the selected parameter [53][54].…”
Section: The Essence Of Modelling and Simulationmentioning
confidence: 99%
“…A smart sustainable approach within the CMFM cluster's activities covers a wide range of economic, social, and environmental issues, including the reduction of lead times; overstocking of cluster enterprises and CLN4.0; freight traffic flows under supply uncertainty by the CCs, which are selected in accordance with their delivery points; the compatibility of the transported freights; and their full handling [5,49,80]. The implementation of such a smart sustainable approach in the framework of these problems is associated with the use of integrated production and SC planning and scheduling [81][82][83] and smart SCM technologies [40,48,76], as well as smart city technologies and indicators for city manufacturing and freight logistics [3,24,46]. Initially, the integrated production and SC planning of the CMFM cluster's enterprises are carried out, considering the compatibility with already planned SCs, both within the cluster and its CLN4.0, and within the megalopolis.…”
Section: Managerial Implicationsmentioning
confidence: 99%