Abstract: The constructional features of arch dams, together with the desire to reduce both the time and the cost of the work required to achieve a monolithic structure, demand increases in the lift height and cementation cross section.In order to prescribe a sound figure for the optimum lift height, which is limited by the carrying capacity of the nonmonolithic dam columns and sections, it is necessary to know the general pattern of grout flow in the joint for various types of grouting systems. Hydraulic investigations… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance