Major blocking factors affecting the application of industrialized building system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
2
1

Relationship

1
7

Authors

Journals

citations
Cited by 21 publications
(6 citation statements)
references
References 53 publications
2
4
0
Order By: Relevance
“…Also, their study delves into the natural frequencies of IBS columns and beams as well as examines the acceleration response, displacement response, and hysteresis response of both column and subframe models. The results from finite element simulations align closely with experimental findings, particularly in terms of displacement response and the identification of failure mechanisms [2,20,21].…”
Section: Contrary To the Results Of Previous Investigationssupporting
confidence: 76%
See 2 more Smart Citations
“…Also, their study delves into the natural frequencies of IBS columns and beams as well as examines the acceleration response, displacement response, and hysteresis response of both column and subframe models. The results from finite element simulations align closely with experimental findings, particularly in terms of displacement response and the identification of failure mechanisms [2,20,21].…”
Section: Contrary To the Results Of Previous Investigationssupporting
confidence: 76%
“…The maximum uplifting displacement at the top of the steel base plate for specimen LC1 was 0.3 mm, while it was 1.2 mm for specimen LS1. These findings align with the cited sources [1,20,34].…”
Section: Load-displacement Relationshipsupporting
confidence: 90%
See 1 more Smart Citation
“…Lack of information and skilled workers are the common obstacles to implementing IBS in Malaysia, directly addresses this issue as it relates to the country's construction industry. Furthermore, obstacles to widespread utilization of IBS included high costs and a shortage of design options [4,9]. Studies have shown that costs are heavily impacted by a wide variety of variables, from the time of project estimation until the time of project completion.…”
Section: Introductionmentioning
confidence: 99%
“…Lately, IBS has generated increasing attention, according to its characteristics of enhancing quality management, minimizing technical-labour force, saving construction time, and eliminating the waste of materials, etc. [20][21][22]. To understand the implementation of IBS in Malaysia, first, it is necessary to understand the Construction Industry Development Board (CIDB) as a governmental organisation that handles the framework of IBS in Malaysia [23,24].…”
Section: Introductionmentioning
confidence: 99%