2016
DOI: 10.2507/26th.daaam.proceedings.155
|View full text |Cite
|
Sign up to set email alerts
|

Maintenance Support System for Reconfigurable Manufacturing Systems

Abstract: The maintenance process is one of the most important elements within the overall scope of plant and facilities engineering function. It is a broad-based technology area for the industrial, commercial, institutional, and business communities. The broad scope of plant and facilities engineering is continuously changing and growing in importance as a key contributor to the success of a total operation. Elements within it, such as maintenance, energy management and regulatory compliance, have all evolved to new le… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
3
2
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(8 citation statements)
references
References 9 publications
0
8
0
Order By: Relevance
“…In case of detected anomalies, the production system needs to adapt in order to run as expected. Rakyta et al explain that system reconfigurability comes with a trade-off [21]. On the one hand, the authors' implementation shows that reconfiguration can increase desired production throughput and improve system functionality by reducing the likelihood of anomaly re-occurrence.…”
Section: Post-processingmentioning
confidence: 99%
“…In case of detected anomalies, the production system needs to adapt in order to run as expected. Rakyta et al explain that system reconfigurability comes with a trade-off [21]. On the one hand, the authors' implementation shows that reconfiguration can increase desired production throughput and improve system functionality by reducing the likelihood of anomaly re-occurrence.…”
Section: Post-processingmentioning
confidence: 99%
“…Defined path networks can be used as the basis for calculations of route and transport time. [4] Using basic commands for drawing, deleting, showing and hiding all logistics areas and logistics tracks they can be seen and designed directly in the 3D layout of production system (Figure 3).…”
Section: Figure 2 -Process Check Table (Author)mentioning
confidence: 99%
“…As the RMS gets reconfigured each time, the production system must be adjusted before it achieves the consistency in achieving the required production rate and desired quality. This is known as ramp-up, which may take as long as months in the traditional manufacturing systems (Rakyta et al, 2016). The goal of RMS is the responsiveness, therefore the studies related to the ramp up time reduction are very essential.…”
Section: Research and Development Issues Associated To Ramp-up Time Reductionmentioning
confidence: 99%