Maintenance Strategy Optimization for Complex Power Systems Susceptible to Maintenance Delays and Operational Dynamics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
9
1

Relationship

2
8

Authors

Journals

citations
Cited by 28 publications
(13 citation statements)
references
References 31 publications
0
10
0
1
Order By: Relevance
“…As recalled by George-Williams and Patelli [15]: "identifying the optimal maintenance strategy is a challenge". In the hope of helping to solve this challenge, we presented a comparative study of selected maintenance policies and a framework for analyzing them.…”
Section: Discussionmentioning
confidence: 99%
“…As recalled by George-Williams and Patelli [15]: "identifying the optimal maintenance strategy is a challenge". In the hope of helping to solve this challenge, we presented a comparative study of selected maintenance policies and a framework for analyzing them.…”
Section: Discussionmentioning
confidence: 99%
“…In this case study, a two-unit hydroelectric power plant adapted from George-Williams and Patelli, 27 and the schematic of which is shown in Figure 7, is analysed. It is a slightly modified model of the Bumbuna hydroelectric power plant, a 50-MW plant in Sierra Leone.…”
Section: Case Studiesmentioning
confidence: 99%
“…al. 2014); lack of personnel (Safaei et al, 2011;George-Williams and Patelli 2017); short-term financial constraints (Litzka and Weninger-Vycudil, 2012); unpredictable events (Liu et al, 2018;Zhong et al, 2019;Finkelstein et al, 2020); maintenance time-constraints (Irawan, 2017;Yang et al, 2017); system mission-constraints (Khatab et. al.…”
Section: Introductionmentioning