2018
DOI: 10.1109/jsyst.2017.2664586
|View full text |Cite
|
Sign up to set email alerts
|

Maintenance Scheduling of Transmission Systems Considering Coordinated Outages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(4 citation statements)
references
References 20 publications
0
4
0
Order By: Relevance
“…In (11), F k,l,t refers to the power flow of line l in the scenario k at hour t while F Rate,l indicates the maximum active power which can be transferred by the line l.…”
Section: Problem Formulation Of Coordinated Optimization a Objementioning
confidence: 99%
See 1 more Smart Citation
“…In (11), F k,l,t refers to the power flow of line l in the scenario k at hour t while F Rate,l indicates the maximum active power which can be transferred by the line l.…”
Section: Problem Formulation Of Coordinated Optimization a Objementioning
confidence: 99%
“…A relaxation induced algorithm has been proposed to efficiently search an acceptable near-optimal solution. Reference [11] has studied the method coordinating maintenance plans for all elements in a transmission bay. Results showed that the level of coordination increased with the decline of element failure probabilities.…”
Section: Introductionmentioning
confidence: 99%
“…Due to the uncertain nature of the power generation by renewable sources [1] and demand profiles within the MG, it poses a challenge on managing the operation of MGs. To overcome this challenge, the related advancement has been achieved on supporting MG owners to decide whether or not to use ESDs, optimizing the size of ESDs [3,4,5], and scheduling the charge and discharge times for these ESDs [6,17]. In general, ESDs could improve the reliability and power quality of a MG.…”
Section: ( )mentioning
confidence: 99%
“…By combining the computed operation cost in (15) - (17) with the steady state information in (18) to (23), the overall cost for PV system can be calculated by Equation (24):…”
Section: B Lower Layer (Asset Maintenance Model)mentioning
confidence: 99%