2010
DOI: 10.2495/cr100331
|View full text |Cite
|
Sign up to set email alerts
|

Maintenance plan optimization for a train fleet

Abstract: Maintenance planning is an important problem for railways, as well as other application domains that employ machinery with expensive replacements and high downtime costs. In a previous paper, we have developed methods for efficiently finding optimized maintenance schedules for a single unit, and proposed that the maintenance plan should be continuously re-optimized based on the condition of components. However, fleet-level resources, such as the availability of expensive spare parts, have largely been ignored.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0
1

Year Published

2017
2017
2022
2022

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 21 publications
(17 citation statements)
references
References 14 publications
(26 reference statements)
0
16
0
1
Order By: Relevance
“…The main issues in railway maintenance are the lack of efficient and inexpensive technology for detecting problems and a lack of proper maintenance procedures [6]. Therefore, an effective railway maintenance strategy is needed to reduce overall costs while preserving the highest maintenance level [7].…”
Section: Introductionmentioning
confidence: 99%
“…The main issues in railway maintenance are the lack of efficient and inexpensive technology for detecting problems and a lack of proper maintenance procedures [6]. Therefore, an effective railway maintenance strategy is needed to reduce overall costs while preserving the highest maintenance level [7].…”
Section: Introductionmentioning
confidence: 99%
“…These additional blocks consist of railcars of types (1, 2, 3), (4,5,6) and so on. We also introduce enough single-car blocks to enforce the following priority order of railcar types in the first iteration of the WLBH: 1, 2, 3, .…”
Section: Propertymentioning
confidence: 99%
“…Because a block of consecutive railcars can be retrieved together, only the cost of the first railcar of the block is taken into account. Finally, we define the domains of the decision variables in (5) and (6).…”
Section: Formal Description Of the Rrtmentioning
confidence: 99%
See 2 more Smart Citations