2009 Chinese Control and Decision Conference 2009
DOI: 10.1109/ccdc.2009.5192537
|View full text |Cite
|
Sign up to set email alerts
|

Maintenance optimization of generating equipment based on a condition-based maintenance policy for multi-unit systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 14 publications
0
4
0
Order By: Relevance
“…This is for example done by Olde Keizer and Teunter (2015) , where each component incurs its own downtime cost. Liu, Xu, Xie, and Kuo (2014) ; Wang, Zheng, Li, Wang, and Wu (2009b) ; Zhou, Zhang, Lin, andMa (2013) , andZhou, Lin, Sun, Bian, andMa (2015) consider a series-parallel system, where multiple subsystems are placed in series, each consisting of multiple components in parallel. Marseguerra, Zio, and Podofillini (2002) consider a series-parallel-series system, where each parallel component is replaced by multiple components in series.…”
Section: Parallel Systemmentioning
confidence: 99%
See 3 more Smart Citations
“…This is for example done by Olde Keizer and Teunter (2015) , where each component incurs its own downtime cost. Liu, Xu, Xie, and Kuo (2014) ; Wang, Zheng, Li, Wang, and Wu (2009b) ; Zhou, Zhang, Lin, andMa (2013) , andZhou, Lin, Sun, Bian, andMa (2015) consider a series-parallel system, where multiple subsystems are placed in series, each consisting of multiple components in parallel. Marseguerra, Zio, and Podofillini (2002) consider a series-parallel-series system, where each parallel component is replaced by multiple components in series.…”
Section: Parallel Systemmentioning
confidence: 99%
“…Marseguerra, Zio, and Podofillini (2002) consider a series-parallel-series system, where each parallel component is replaced by multiple components in series. Whereas Marseguerra et al (2002) ; Wang et al (2009b) ; Zhou et al (2013) , andZhou et al (2015) use repair or replacement thresholds, Liu et al (2014) assume that maintenance is initiated when the system reliability drops below a certain threshold. They use a yield-cost measure to decide which components to replace.…”
Section: Parallel Systemmentioning
confidence: 99%
See 2 more Smart Citations