2012
DOI: 10.1016/j.phpro.2012.06.304
|View full text |Cite
|
Sign up to set email alerts
|

Main Design Principles of the Cold Beam Pipe in the FastRamped Superconducting Accelerator Magnets for Heavy Ion Synchrotron SIS100

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…In between the two units a cryo catcher [7] is located. The He-supply system consists of a LHe-supply line for magnet cooling [8], a LHe-supply line for vacuum chamber cooling, a 2-phase-He return line, a flow restrictor for vacuum chamber supply and other flow restrictors for magnet supply. The cold mass is integrated by a common girder structure and is suspended by a suspension system, composed from crossed load-and tie rods [3].…”
Section: Arc Section Modulesmentioning
confidence: 99%
“…In between the two units a cryo catcher [7] is located. The He-supply system consists of a LHe-supply line for magnet cooling [8], a LHe-supply line for vacuum chamber cooling, a 2-phase-He return line, a flow restrictor for vacuum chamber supply and other flow restrictors for magnet supply. The cold mass is integrated by a common girder structure and is suspended by a suspension system, composed from crossed load-and tie rods [3].…”
Section: Arc Section Modulesmentioning
confidence: 99%