Ninth International Conference on Road Transport Information and Control 1998
DOI: 10.1049/cp:19980173
|View full text |Cite
|
Sign up to set email alerts
|

M25 controlled motorway - results of the first two years

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2000
2000
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The HTMS also caused a decrease in travel times in one direction while travel times in the other direction were increased. This is caused not only by imposed speed limits but also by more strict enforcement [11]. Also, further investigations on this highway could not demonstrate a statistically significant decrease in travel times [12].…”
Section: State-of-artmentioning
confidence: 99%
“…The HTMS also caused a decrease in travel times in one direction while travel times in the other direction were increased. This is caused not only by imposed speed limits but also by more strict enforcement [11]. Also, further investigations on this highway could not demonstrate a statistically significant decrease in travel times [12].…”
Section: State-of-artmentioning
confidence: 99%
“…VSL control can also be used to reduce the chance of secondary accidents by displaying lower speed limits when there has been an accident on the freeway [9,12,[14][15][16][17][18]. Due to these bene ts, use of VSL controls have been encouraged in various countries such as the Netherlands, Sweden, England, Japan, and Turkey [19][20][21][22]. VSLs can also help drivers to adapt their speed to match traf c, environmental, or weather conditions [23].…”
Section: Introductionmentioning
confidence: 99%
“…Reactive approaches monitor inactive bottlenecks and activate after a certain threshold (Hong et al., ; Brinckerhoff et al., ). For instance, a VSL system on the M25 highway in the United Kingdom activates when traffic volume exceeds 1,650 veh/h/lane and reduces speed limit from 70 to 60 mph (Harbord, ). In fact, reactive approaches activate the VSL strategy after detecting a problem.…”
Section: Introductionmentioning
confidence: 99%