2014
DOI: 10.12816/0006193
|View full text |Cite
|
Sign up to set email alerts
|

M[X]/G/1 Retrial Queueing System with Second Optional Service , Random Break down ,Set Up Time and Bernoulli Vacation

Abstract: In this paper, we investigate a single server batch arrival non-Markovian retrial queueing model with random break down and Bernoulli vacation. Customers arrive in batches accordingly Poisson process with arrival rate λ but are served one by one with first come first served basis. All customers demand the first essential service, whereas only some of them demand the second optional service. The server is assumed to be unreliable so that it may encounter break down at any time. As the server has to be repaired,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
0
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 31 publications
(22 reference statements)
0
0
0
Order By: Relevance
“…working vacation and interruption of M/G/1 vacation queue investigated in [21]. The k phases service, Bernoulli's feedback T-policies for M/G/1 line model investigated in [22][23]. M [X] /G/1 queuing model with time-dependent solution instead of Bernoulli k vacation and balking consumers was examined in [23].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…working vacation and interruption of M/G/1 vacation queue investigated in [21]. The k phases service, Bernoulli's feedback T-policies for M/G/1 line model investigated in [22][23]. M [X] /G/1 queuing model with time-dependent solution instead of Bernoulli k vacation and balking consumers was examined in [23].…”
Section: Introductionmentioning
confidence: 99%
“…The k phases service, Bernoulli's feedback T-policies for M/G/1 line model investigated in [22][23]. M [X] /G/1 queuing model with time-dependent solution instead of Bernoulli k vacation and balking consumers was examined in [23]. [24] Studied the expected delay of the M/ G/1 cyclic system service line using Bernoulli scheduling.…”
Section: Introductionmentioning
confidence: 99%