1994
DOI: 10.1016/0377-2217(94)90082-5
|View full text |Cite
|
Sign up to set email alerts
|

Lot streaming in three-stage production processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

1
41
0

Year Published

1997
1997
2018
2018

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 77 publications
(42 citation statements)
references
References 17 publications
1
41
0
Order By: Relevance
“…The presence of setups makes the structure of the optimal solution substantially more complex in most cases. Nevertheless, it is possible to extend most of the results from [6] to our case. For the three-machine ft.ow shop, this leads to an algorithm which finds the optimal schedule in O(log s) time.…”
Section: Introductionmentioning
confidence: 72%
See 4 more Smart Citations
“…The presence of setups makes the structure of the optimal solution substantially more complex in most cases. Nevertheless, it is possible to extend most of the results from [6] to our case. For the three-machine ft.ow shop, this leads to an algorithm which finds the optimal schedule in O(log s) time.…”
Section: Introductionmentioning
confidence: 72%
“…The structure of the optimal network for such a problem was described in detail in [6]. Of this, we need only the fact that every sublot is critical in an optimal solution of the relaxed problem.…”
Section: (2)mentioning
confidence: 99%
See 3 more Smart Citations