Day 2 Tue, October 10, 2017 2017
DOI: 10.2118/187203-ms
|View full text |Cite
|
Sign up to set email alerts
|

Look Ahead Geosteering via Real Time Integration of Logging While Drilling Measurements with Surface Seismic

Abstract: Structural estimation capability ahead of the bit is evolving with innovative combination while drilling of borehole and surface data in real time. A pioneering workflow has been developed to recalibrate the reservoir structure via integration of surface seismic with synthetic seismic, derived from logging-while-drilling (LWD) measurements. Modern LWD services have nowadays reached a significant depth of investigation capability, expanding the horizons of geosteering applications. The most recen… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…Bashir et al (2016) have explained how the formation tops in a 3D geo-cellular near-well sector model were adjusted in depth during drilling. In Arata et al (2017) a case study shows how a real-time local recalibration of seismic to minimize the depth discrepancy, based on LWD measurements, supports improved prediction of the reservoir boundaries ahead of the bit. Finally, in (Payrazyan et al, 2017) it is explained how the geological structures (faults and stratigraphic interfaces) in a 2D section along the well can be adjusted in real-time to fit the measurements, as basis for real-time sketching of a desired trajectory in the graphical interface.…”
Section: Introductionmentioning
confidence: 98%
See 1 more Smart Citation
“…Bashir et al (2016) have explained how the formation tops in a 3D geo-cellular near-well sector model were adjusted in depth during drilling. In Arata et al (2017) a case study shows how a real-time local recalibration of seismic to minimize the depth discrepancy, based on LWD measurements, supports improved prediction of the reservoir boundaries ahead of the bit. Finally, in (Payrazyan et al, 2017) it is explained how the geological structures (faults and stratigraphic interfaces) in a 2D section along the well can be adjusted in real-time to fit the measurements, as basis for real-time sketching of a desired trajectory in the graphical interface.…”
Section: Introductionmentioning
confidence: 98%
“…To place a well precisely in the best reservoir zone, operators use geosteering to adjust the well trajectory in response to real-time information acquired while drilling. The benefits of geosteering, such as higher production rates of the resulting wells, have been extensively documented in the literature (Al-Fawwaz et al, 2004;Janwadkar et al, 2012;Guevara et al, 2012;Tosi et al, 2017).…”
Section: Introductionmentioning
confidence: 99%