2022
DOI: 10.1016/j.undsp.2021.11.007
|View full text |Cite
|
Sign up to set email alerts
|

Longitudinal connection effect on initial support steel frames in tunnels—Take the traffic tunnels as examples

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 19 publications
0
3
0
Order By: Relevance
“…e purpose of the unmanned workshop is achieved through remote control programming. By optimizing the overall layout and design of the four production lines in a tunnel reinforcement factory, each production line can achieve streamlined operations and overall layout [38,39].…”
Section: Implementation Steps Of Intelligent Production Linementioning
confidence: 99%
“…e purpose of the unmanned workshop is achieved through remote control programming. By optimizing the overall layout and design of the four production lines in a tunnel reinforcement factory, each production line can achieve streamlined operations and overall layout [38,39].…”
Section: Implementation Steps Of Intelligent Production Linementioning
confidence: 99%
“…Guozhong et al [3] explored the issues related to steel arch frame segment connections for tunnel primary support and suggested enhancements for tunnel steel arch frame connections. Ma et al [4] demonstrated that incorporating longitudinal connections in tunnel steel arch frames can reduce plastic and shotcrete damage, thus bolstering the primary support's capacity under comparable stress conditions. Song et al [5] conducted research on I-beam and hollow-pipe string joints through static and cyclic loading tests, offering an in-depth analysis of connection performance and its failure under various loading scenarios.…”
Section: Introductionmentioning
confidence: 99%
“…The initial support of the tunnel should bear all the surrounding rock loads at the early stage, and its stress characteristics are correlated with the safety of the tunnel construction period and the load distribution of the subsequent secondary lining. The initial support of the tunnel is the key stress structure in the tunnel support system [11,12]. The existing research has achieved fruitful results in the interaction relationship of support surrounding rock, as well as in the analysis and evaluation of support stress.…”
Section: Introductionmentioning
confidence: 99%