2020
DOI: 10.1155/2020/8898433
|View full text |Cite
|
Sign up to set email alerts
|

Long‐Term Settlement of High Concrete‐Face Rockfill Dam by Field Monitoring and Numerical Simulation

Abstract: High concrete-face rockfill dams (CFRDs) with heights of over 100 m have been quickly developed in recent years. The self-weight of rockfill materials causes creep deformation of the dam body. However, the creep analysis method of high CFRDs in finite element software is few, and sometimes, it can also not reflect the long-term performance of high CFRDs well. Therefore, it is necessary to carry out the secondary development in finite element software. This study developed a subroutine that can run in Finite El… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
3
1

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 56 publications
0
2
0
Order By: Relevance
“…At the same time, it can be concluded from the above results that there are many defects in technology and organizational management and the focus is on the mistakes of operation and management of two types of construction groups. To improve the level of building safety management, it can be carried out by increasing technical training, strengthening on-site supervision and supervision, and improving safety management regulations [23]. If the personnel management is simply carried out, the problem of insufficient and comprehensive safety management may be caused due to factors such as experience, knowledge, and technology.…”
Section: Statistics and Analysis Of Accidents In The Mainmentioning
confidence: 99%
“…At the same time, it can be concluded from the above results that there are many defects in technology and organizational management and the focus is on the mistakes of operation and management of two types of construction groups. To improve the level of building safety management, it can be carried out by increasing technical training, strengthening on-site supervision and supervision, and improving safety management regulations [23]. If the personnel management is simply carried out, the problem of insufficient and comprehensive safety management may be caused due to factors such as experience, knowledge, and technology.…”
Section: Statistics and Analysis Of Accidents In The Mainmentioning
confidence: 99%
“…In this table, the combination of factor levels corresponding to each row refers to one type of test plan. Then, FEM calculation was carried out according to the test designed in the orthogonal table, and literature(Zhou et al 2020) shows the specific FEM calculation process.…”
mentioning
confidence: 99%