2010
DOI: 10.1109/tase.2010.2050139
|View full text |Cite
|
Sign up to set email alerts
|

Long-Term Scheduling for Cascaded Hydro Energy Systems With Annual Water Consumption and Release Constraints

Abstract: Long-term scheduling for cascaded hydro energy systems is very important for low carbon energy production. It aims at determining the water release over a planning horizon to meet water resource requirements and the system demands for electric power. The problem is challenging in view of the complicated and stochastic system dynamics, nonlinear marginal cost, coupled hydraulic constraints, and the large problem size. In this paper we formulate the long-term scheduling problem of cascaded hydro energy systems w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2010
2010
2019
2019

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 24 publications
(17 citation statements)
references
References 25 publications
0
15
0
Order By: Relevance
“…However, this paper focuses on the vertically integrated utility in China, and the energy price is regulated and set by the government [7], hence, energy price parameters in the studied time horizon are set to be 1, and equivalently the objective of this problem is to maximize the total generation over the planning horizon.…”
Section: Mathematical Model 21 Objective Functionmentioning
confidence: 99%
See 1 more Smart Citation
“…However, this paper focuses on the vertically integrated utility in China, and the energy price is regulated and set by the government [7], hence, energy price parameters in the studied time horizon are set to be 1, and equivalently the objective of this problem is to maximize the total generation over the planning horizon.…”
Section: Mathematical Model 21 Objective Functionmentioning
confidence: 99%
“…In [7], a stochastic optimization problem with Markov decision process models was developed allowing for the constraints of governmental regulations. In [8], a novel stochastic risk-constrained model was discussed.…”
Section: Introductionmentioning
confidence: 99%
“…SBPI improves given base policies through simulation, and has been successfully applied to many problems including the quiz problems, wireless sensor network [18], water source management [19], and engine maintenance problems [20]. Because simulation could be very time-consuming and a large number of replications is usually used in SBPI, it is of great practical interest to seek a method that efficiently uses the sample paths so that the best action is selected with high probability.…”
Section: Related Workmentioning
confidence: 99%
“…We have developed a sensitivity based approach for finite horizon MDPs with discrete state and action spaces in our previous work [24][25] [28]. In this section, we will extend the main result to the finite-horizon MDPs with continuous state and action spaces in order to solve the water resources planning problem formulated in the previous section.…”
Section: Sensitivity Based Approach For Continuous Mdpmentioning
confidence: 99%
“…Problem approximations, like aggregation and decomposition of reservoirs, are considered in [9]- [11]. In our previous work, the water resources planning problem is formulated as a constrained Markov decision problem and a "rollout" based approximate dynamic programming method is developed to solve the problem with quantified approximation [28]. The major issue of the existing methods is that discretization in decision space is generally needed and we have to deal with the dilemma of approximation precision and computational efforts.…”
Section: Introductionmentioning
confidence: 99%