Location and Depth of Pervious Concrete Clogging Material before and after Void Maintenance with Common Municipal Utility Vehicles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
2
2

Relationship

0
9

Authors

Journals

citations
Cited by 47 publications
(12 citation statements)
references
References 4 publications
0
11
0
Order By: Relevance
“…Two of the three surfaces maintained observed permeability after cleaning. Vancura et al (2012) concludes that consolidation of clogging material dictates permeability, rather than quantity of clogging material. Material left in the voids may not have consolidated, and therefore allowed water passage after cleaning.…”
Section: Chapter 8: Maintenance Permeable Pavementsmentioning
confidence: 97%
See 1 more Smart Citation
“…Two of the three surfaces maintained observed permeability after cleaning. Vancura et al (2012) concludes that consolidation of clogging material dictates permeability, rather than quantity of clogging material. Material left in the voids may not have consolidated, and therefore allowed water passage after cleaning.…”
Section: Chapter 8: Maintenance Permeable Pavementsmentioning
confidence: 97%
“…The speed of the vacuum machine is then adjusted as needed. Vancura et al (2012) evaluated cleaning on three pervious concrete sites: an alley apron, alley, and lowvolume residential street. The ages were one year, two years, and one month, respectively, and each had varying degrees of clogging.…”
Section: Chapter 8: Maintenance Permeable Pavementsmentioning
confidence: 99%
“…Sediments deposited on the pavement and/or transported by the runoff that pass through the porous matrix during storm events progressively block its interconnected pores and, consequently, reduce the infiltration capacity of the PPS dramatically [22]. Usually, the clogging layer produced is located near the surface, mainly in the first 1.5 cm, with consolidation in the first 6-7 mm [23]. The sediment particle sizes, together with the average daily traffic, pavement age and nearness of vegetated areas are considered the main external factors that influence the clogging rate of PPS [24].…”
Section: Introductionmentioning
confidence: 99%
“…MSS followed by VSS) was much more effective than had been previously concluded by the Nationwide Urban Runoff Program (NURP). Vancura et al (2012) observed that pervious concrete void maintenance depends on what machines owners have available and that they choose to use. They compared the abilities of three common municipal utility vehicles to unclog in-service pervious concrete pavements: a vacuum truck with a flexible 200 mm hose; a VSS; and a RASS.…”
Section: Effectiveness Of Cleaning Equipmentmentioning
confidence: 99%