All Days 1991
DOI: 10.4043/6688-ms
|View full text |Cite
|
Sign up to set email alerts
|

Loadout, Transportation, and Installation of the Harmony and Heritage Jackets

Abstract: As an integral part of Exxon's Santa Ynez Unit (SYU) Expansion Project, the Harmony and Heritage platform jackets were loaded out from a fabrication yard in South Korea, transported across the Pacific Ocean, and installed offshore California in water depths of 1200 feet and 1075 feet, respectively (Figure 1). Overall this was a 9-1/2 month effort, beginning with the Harmony jacket load-out in April, 1989 and ending with the Heritage jacket post-installation inspection in February 1990. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2008
2008
2008
2008

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance